DeSoto HIGH SCHOOL

DESOTO, KS

Contractor:  Foundation Recovery Systems.


Project Details:  This project consisted of a foundation shoring along a 56 foot long section of a stepped concrete foundation with a masonry wall above to allow for excavation for construction of a basement addition to the high school. 


The design incorporated 14 push piers 11 helical lateral restraints and a 350 sq.ft reinforced shotcrete wall with 23 helical soil nails.

CONTACT US
  • Foundation of a building with exposed concrete and brick, excavation site, metal supports in soil.