JORDAN PARK
PORTLAND, OR
![1368640244_4607.jpg](https://static.wixstatic.com/media/d809a4_f96d5a02a5f84837a4f9779fbe54306f~mv2.jpg/v1/crop/x_0,y_16,w_800,h_568/fill/w_543,h_344,al_c,q_80,usm_0.66_1.00_0.01,enc_auto/1368640244_4607.jpg)
Contractor: TerraFirma Foundation Systems
Project Details:
This project consisted of a foundation shoring along a 56 foot long section of a stepped concrete foundation with a masonry wall above to allow for excavation for construction of a basement addition to the high school. The design incorporated 14 push piers 11 helical lateral restraints and a 350 sq.ft reinforced shotcrete wall with 23 helical soil nails.
![1368640146_7117.jpg](https://static.wixstatic.com/media/d809a4_660f7ddd67054057b76427642371c189~mv2.jpg/v1/fill/w_371,h_340,al_c,q_80,usm_0.66_1.00_0.01,enc_auto/1368640146_7117.jpg)
![1368640186_6979.jpg](https://static.wixstatic.com/media/d809a4_59935400ab754616a9f70ec857431842~mv2.jpg/v1/fill/w_567,h_340,al_c,q_80,usm_0.66_1.00_0.01,enc_auto/1368640186_6979.jpg)
![logo.png](https://static.wixstatic.com/media/d809a4_b9f359734ba041dfa0ac41bb2436db77~mv2.png/v1/fill/w_190,h_131,al_c,q_85,usm_0.66_1.00_0.01,enc_auto/logo.png)
bottom of page